Montag, August 3, 2026
No Result
View All Result
Sport Insider
  • Home
  • F 1
  • Home
  • F 1
No Result
View All Result
Sport Insider
No Result
View All Result

Hye-Jin Choi maintains tournament-long lead at LPGA Malaysia

November 2, 2025
in Golf
Reading Time: 2 mins read
0 0
A A
0
Home Golf
Share on FacebookShare on Twitter


KUALA LUMPUR, Malaysia — Sustaining the lead she has held because the opening spherical and searching for her first win on the LPGA Tour, Hye-Jin Choi will take a four-stroke benefit into the ultimate spherical of the Maybank Championship after taking pictures a 5-under 67 on Saturday.

Choi, who performed on the South Korea group in final week’s Worldwide Crown, had a 54-hole complete of 19-under 197 on the Kuala Lumpur Golf and Nation Membership course. She began the day with a five-stroke lead.

The 26-year-old Choi has 28 profession top-10 finishes and positioned second on the 2017 U.S. Ladies’s Open as a 17-year-old novice.

It’s the first time in her profession she has led after the primary three rounds of play and the third time she has led a match heading into the ultimate spherical. The earlier two occasions she completed runner-up.

„I have been ready for this a extremely lengthy [time], and I’ll strive my finest tomorrow,“ Choi stated. „I feel I’ll really feel like I am making the dream and I simply think about on it. I am simply searching for a victory tomorrow.“

China’s Liu Yan (65) was in second place after a bogey-free spherical, and Hannah Inexperienced, a member of the successful Australia group on the Worldwide Crown final weekend, was in third after a 67, 4 strokes behind Choi.

A Lim Kim was the most important mover with a 64 that left her in a tie for fourth place, six strokes off the lead. Kim’s spherical included an eagle on No. 18 and 6 birdies.

„It was a terrific shot, however unbelievable,“ Kim stated of her 25-foot eagle putt on No. 18. She began her spherical with 4 birdies in 5 holes.

World No. 1 Jeeno Thitikul, a runner-up in Malaysia the previous two years, shot 65 and was additionally tied for fourth. She birdied her final three holes Saturday.

„I do not know what is going on on, nevertheless it’s good,“ stated Thitikul. She credited her many followers within the gallery for his or her assist, saying once more the venue was like a „mini-Thailand“ for her.

Defending champion Yin Ruoning shot 69 and was in seventh place, seven strokes behind Choi and tied with New Zealander Lydia Ko (68). Brooke Henderson shot 68 and was 11 strokes behind.

Subsequent week, the LPGA ends its five-week Asian swing with the Japan Basic at Shiga.



Source link

Tags: ChoiHyeJinLeadLPGAmaintainsMalaysiatournamentlong
Previous Post

What happened on fateful Game 6 play as Blue Jays waste World Series chance

Next Post

AUS vs IND: Ravichandran Ashwin slams Gautam Gambhir over Arshdeep Singh’s exclusion from India’s T20I squad

Related Posts

Jamie Van Wyk wins English Amateur – Golf News
Golf

Jamie Van Wyk wins English Amateur – Golf News

August 2, 2026
Costco Is Running A Rare Sale On Kirkland Signature Golf Balls
Golf

Costco Is Running A Rare Sale On Kirkland Signature Golf Balls

August 2, 2026
Callaway Quantum Mini Spinner: A Fairway Wood Built To Spin More And Land Softer
Golf

Callaway Quantum Mini Spinner: A Fairway Wood Built To Spin More And Land Softer

August 1, 2026
UK Golf Resort Review: Carden Park, Cheshire – Golf News
Golf

UK Golf Resort Review: Carden Park, Cheshire – Golf News

Juli 30, 2026
Can Bettinardi’s New Junior Series Putters Captivate And Motivate Young Golfers?
Golf

Can Bettinardi’s New Junior Series Putters Captivate And Motivate Young Golfers?

Juli 31, 2026
Five Iron Golf opens first UK venue in London – Golf News
Golf

Five Iron Golf opens first UK venue in London – Golf News

Juli 31, 2026
Next Post
AUS vs IND: Ravichandran Ashwin slams Gautam Gambhir over Arshdeep Singh’s exclusion from India’s T20I squad

AUS vs IND: Ravichandran Ashwin slams Gautam Gambhir over Arshdeep Singh’s exclusion from India’s T20I squad

Proud father moment: Cristiano Ronaldo’s reaction to son’s first goal for Portugal U-16 says it all

Proud father moment: Cristiano Ronaldo’s reaction to son’s first goal for Portugal U-16 says it all

Schreibe einen Kommentar Antwort abbrechen

Deine E-Mail-Adresse wird nicht veröffentlicht. Erforderliche Felder sind mit * markiert

  • Trending
  • Comments
  • Latest
Moonlight Peaks Console Commands and Cheats

Moonlight Peaks Console Commands and Cheats

Juni 30, 2026
Lionel Messi: World Cup 2026 playing schedule, fixtures, kick off times, where to watch, confirmed news updates and full Argentina squad

Lionel Messi: World Cup 2026 playing schedule, fixtures, kick off times, where to watch, confirmed news updates and full Argentina squad

Juli 4, 2026
Full list of confirmed teams and fixtures for FIFA football tournament after qualifiers

Full list of confirmed teams and fixtures for FIFA football tournament after qualifiers

April 1, 2026
World Cup 2026 Final Spain vs. Argentina Predictions

World Cup 2026 Final Spain vs. Argentina Predictions

Juli 19, 2026
Monte Carlo Masters Draw 2026

Monte Carlo Masters Draw 2026

April 4, 2026

Lewis Hamilton Bids Farewell to PETRONAS in Malaysia

Dezember 15, 2024
Tyler Adams: Man United take a gamble as Newcastle allowed a free run – Man United News And Transfer News

Tyler Adams: Man United take a gamble as Newcastle allowed a free run – Man United News And Transfer News

0
Jamie Van Wyk wins English Amateur – Golf News

Jamie Van Wyk wins English Amateur – Golf News

0
Yankees Acquire Luis Garcia Jr.

Yankees Acquire Luis Garcia Jr.

0
Will Kelsey Plum Stay With the Mercury after Sparks Trade?

Will Kelsey Plum Stay With the Mercury after Sparks Trade?

0
PHOTOS: World Of Outlaws At Williams Grove Speedway

PHOTOS: World Of Outlaws At Williams Grove Speedway

0
Chelsea sign Barco from Strasbourg on seven-year deal

Chelsea sign Barco from Strasbourg on seven-year deal

0
Yankees Acquire Luis Garcia Jr.

Yankees Acquire Luis Garcia Jr.

August 2, 2026
Tyler Adams: Man United take a gamble as Newcastle allowed a free run – Man United News And Transfer News

Tyler Adams: Man United take a gamble as Newcastle allowed a free run – Man United News And Transfer News

August 2, 2026
Chelsea sign Barco from Strasbourg on seven-year deal

Chelsea sign Barco from Strasbourg on seven-year deal

August 2, 2026
Will Kelsey Plum Stay With the Mercury after Sparks Trade?

Will Kelsey Plum Stay With the Mercury after Sparks Trade?

August 2, 2026
Pakistan in West Indies 2026, WI vs PAK 2nd Test Match Report, August 02 – 06, 2026

Pakistan in West Indies 2026, WI vs PAK 2nd Test Match Report, August 02 – 06, 2026

August 2, 2026
Jamie Van Wyk wins English Amateur – Golf News

Jamie Van Wyk wins English Amateur – Golf News

August 2, 2026

Get the latest sports news, live scores, in-depth analysis, and expert commentary on football, basketball, tennis, and more. Stay updated with breaking news and comprehensive coverage of your favorite sports and teams.

CATEGORIES

  • Athletics
  • Baseball
  • Basketball
  • Boxing
  • Cricket
  • Cycling
  • ESports
  • Football
  • Formula 1
  • Golf
  • MMA
  • Racing
  • Tennis

LATEST UPDATES

  • Yankees Acquire Luis Garcia Jr.
  • Tyler Adams: Man United take a gamble as Newcastle allowed a free run – Man United News And Transfer News
  • Chelsea sign Barco from Strasbourg on seven-year deal

Copyright © 2024 Sport Insider.
Sport Insider is not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • F 1

Copyright © 2024 Sport Insider.
Sport Insider is not responsible for the content of external sites.